Army TRILOS

Rapid PTP Deployment for US Army TRILOS Expeditionary Network Comms

BlueSky Mast + Army TRILOS

BlueSky Mast systems provide expeditionary elevation required for the US Army's tactical network modernization and fielding of the Terrestrial Transmission Line of Sight (TRILOS) radio program. BlueSky Mast systems provide the expeditionary elevation architecture required to maximize signal range and bandwidth. Engineered for rapid, toolless deployment in austere environments, BlueSky's modular mast platforms securely elevate TRILOS PTP hardware above terrain obstructions, significantly reducing Size, Weight, and Power (SWaP) while ensuring resilient, low-latency battlefield backhaul for maneuvering units.
Collaborative Partner
Army TRILOS
BlueSky Mast System
350 Lift Series - 15 Meters (49 ft.)
Payload
US Army TRILOS
Benefits
BlueSky mast systems securely elevate Point-to-Point (PTP) hardware well above terrain obstructions for clear line-of-sight comms & optimized network performance.
BlueSky mast systems utilize modular, patent-protected camlock system and tripod based sectional architecture. Deploy payloads quickly even in austere environments without the need for specialized tools or external power sources.
BlueSky mast systems are Size, Weight, & Power (SWaP) optimized. Mast systems are designed to be lightweight, highly transportable, and with a small footprint. Mast systems pack into ruggedized hard cases for efficient transport and a reduced logistical burden OTM.
Fast teardown and setup cycles reduce network downtime during displacement, enabling mobile command posts to relocate frequently and maintain uninterrupted situational awareness against near-peer threats.
Lightweight, modular deployment architectures require fewer operators to erect and strike, lowering the manpower burden on signal teams during rapid tactical relocations.
Key Capabilities
Maximized signal range & bandwidth.
Mission Kit

BlueSky Mast 350 Series Mast Integrated with US Army TRILOS

350 Lift Series - 15 Meters (49 ft.)

Integrated with

TRILOS

Model Heights: 

15

meters /

49

feet

Payload Capacity:

34

kg /

75

lbs

(See Capabilities Chart)

Wind Loading:

144.8

km/h /

90

mph

Deployment Time:

25-45 minutes, 2 people

Outside Diameter:

3.5

inches

Testing: MIL-STD-810G 

Transport:

(2) 62 x 21 x 14.5 Custom Hard Cases