Mission Kit · 350 Lift Series

BlueSky Mast Systems + CPE C2IN STS

BlueSky Mast rapid-elevation systems provide the structural foundation and tool-less vertical reach to maximize the range, speed and reliability of the Army's Sustainment Transport System (STS) Line-of-Sight program.

01

The Mast

350 Lift Series - 10 Meters (31.5 ft.)

P/N
350G-W-L310-LFT-000
Height
10 m / 31.5 ft
Payload capacity
125 lb / 56.7 kg
Wind rating
90 mph / 144.8 km/h
Crew · Setup
2 · 15–30 min
View the mast system

02

What Rides on the Mast

Command, Control & Communications

See It in the Field

Sustainment Network Links at 10 m: CPE C2IN STS on the BlueSky Mast 350 Lift Series

STS gives Army logistics teams SATCOM, line-of-sight and Wi-Fi transport for enterprise systems such as GCSS-Army and IPPS-A. Raising the point-to-point radios connects dispersed nodes without tools or external power.

Next Steps

Configure Your Mission Kit

Tell us the payload and the mission. We'll configure the mast to carry it.